Wednesday, March 21, 2012

not on the level

do not move flooring sign
this just about sums it up

jigs-floor
Jigs is posing in front of the floor which was laid, pulled up, numbered by row and neatly stacked for reinstallation.

shade from above
using paper models to test out the scale and shape of the light fixture in the void

light-below
does sarah richardson do tests like this?

Over the past couple of weeks our reno has veered into the reality-TV zone. The place where things go wrong, wires get crossed and the knock-on effect of the delay is felt by every other contractor in the process. The floors in this old house roll up and down like a ride at Disney world. We knew they were a problem but they have turned into a bigger problem then we anticipated and we had to order new flooring, reschedule the installation of the floor, installation of the kitchen, the countertops, the final painting...you get the drift. We were ahead of schedule and are now falling back a bit. Fingers crossed everyone. We need trucks to travel swiftly and the proper alignment of contractor schedules.

When you have been dealt a couple of bad hands in the reno roulette, there is nothing like a bit of demolition to get your heart back in the game. Last week we marked the end of an era with the demo of the old steps that led to the upper floor. They have been made redundant by the new stairway inside. The upper level doors will have railings across them without stairs.



Saturday, March 10, 2012

turning on the heat

paint
you can have any colour you want as long as it is neutral

paint colour
colour enthusiasts may be a bit disappointed with my choice of grey

S&R guestroom
the susan/rachel guestroom is painted out to match benjamin moore's bleeker beige

upper level skylights
most of the open areas are painted in a very light grey which reads as warm white

doors to void
almost all of the doors have been hung, trimmed and painted

upper level closet
the shelving and built-in bits have been installed in the closets

jigs hall
Jigs is still wondering where her food dishes are going to go

foil layer
the upper floors were laid with a foil covering as preparation for the on-floor heat system

onfloor heat closeup
plywood "sleepers" create pathways for the hot water piping which is stapled into place

onfloor heat & feet
the plywood sleepers are screwed into the subfloor to secure them

TV room floor
TV room floor

upper level bedroom to hall
upper level bedroom to hall

bridge
upper level hall

upper level opening
upper level opening to kitchen

upper level opening south
upper level opening

2nd level to 1st
looking over the edge

Lauchie is home and is enjoying the reno up-close and personal. But he wants to make sure that my audience (he holds up two fingers to indicate the readers) is kept up to date on the activity on the jobsite. Most of the work that has gone on over the last two weeks is not very photogenic. The painting of white primer with almost white paint doesn't look like much. The installation of the on-floor heat system gave me something graphic to work with. More artworks from Tony the plumber. The weather today is gloriously sunny and the light pouring in through the new windows made us anxious to move back in. It won't be long now. The floors are scheduled for installation next Wednesday and the kitchen goes in the following week.

Monday, February 20, 2012

building inspector

building inspector
jc landry inspects site

kitchen view to back
kitchen view to backyard

sun over airwell
a few of the boards covering the airwell have been removed and you can glimpse the lower level.

guestroom
last week the trim work began. "susan's room" has one window trimmed out.

trim office window
the office trim is almost finished.

office
office

office view to foyer
the doors are being hung

view from office
view of the front garden from the new office window

boiler
the new blue boiler that will keep us warm

My father loves building things almost as much as he loves talking to people. Construction sites offer the perfect marriage of both. Anything under construction is fair game and he casually drops into building sites and chats with anyone who will answer his questions. Folks are surprisingly free with information and he usually comes away from each visit with a wealth of technical advice and a full background report on personalities involved. We joke that he is the local building inspector and I think some people might think he really is official. Needless to say, our renovation is of great interest to him and he's been keeping tabs on everything through the blog (hi dad!) and with his site visits. He signed off on the trim work last week and got some good tips on mud application from the tapers.

Wednesday, February 15, 2012

wide angle

kitchen windows
new kitchen window installation

kitchen window wide
trying out a wide angle lens on the windows

foyer-to kitchen
foyer view to kitchen

over foyer
void over foyer

stairwell
stairwell

upper level library shelves
upper level library shelves

upper level hall-view to TV room
upper level hall - view to TV room

TV media room
TV room

upper level view to TV room
upper level view to TV room

upper bedroom to hall
upper level bedroom view to hall

upper-bedroom
upper level bedroom

bathroom
bathroom

The last of the windows went in today. Two windows for the kitchen were held back until the cabinets could be installed underneath the openings. When the countertop comes it will extend into the sill so the windows had to hung at just the right height. The drywallers continue to tape, sand and fill the gyroc and the plumber has been busy installing the boiler for the heating system.

I'm trying out a new lens on my camera. The Lumix GF1 came with a 20mm lens which takes great images but was not giving me much scope for the wide angles needed for these interiors. I wish I had been using this from the beginning of the reno. Everything looks spacious and grand. This must be how real estate agents make one room shoe boxes look palatial...it's all smoke and mirrors.

Tuesday, February 7, 2012

the big one

sunrise over scaffold
the sun coming through the scaffold

window tied down
the scaffold was used to get this big guy...

old upper level window
...up to the upper level to replace the 4 paned window above the door

large window installed
the builder told me that I probably shouldn't watch when they installed this one. They snapped it in pretty quickly and without a trip to the emergency ward

large window straight
it looks like this on the inside

large window view to tv room
view toward tv room

view to opening
view toward opening

bookcases
the corner bead has been added to bookcase openings

stairwell
scaffold in stairwell

office view to foyer
office view to foyer

upper window-view to northwest arm
tv room view toward northwest arm

crows from window
crow flypast. the top of dingle tower is just visible through the trees

worksite
just in case this is all getting too romantic...the worksite looks like this

They drywall tapers are quietly moving from corner to corner as they install corner beading and mesh. At this phase of the job, women have made their first appearance on the job site. There is a woman hanging drywall and another woman has joined the team of tapers. Otherwise, it has been an all-boy crew doing the work. One of the tapers wears metal stilts which make him seem like a creature from starwars. The stilts are so cool. I wish I had a pair. Think of what you could do with them on halloween!